Skip navigation

Monthly Archives: March 2015

My To Do List is growing!

The greenhouse needs re-sheeting (eventually be glassed in).
The fence needs mended.
The garden needs weeded.
The rest of the cabin needs sanded and sealer put on.
The woodshed needs a refinishing and restocked (mostly after someone helped themselves to half of the wood).
The cache needs to be rebuilt (it finally toppled last fall).
The cabin floor needs to be repainted.
The sauna needs sanded and sealer put on too.
The sauna needs a metal roof at some point…

Now at my house…

The greenhouse needs to be erected.
The garden needs tilling.
Seedlings need to be transplanted.
The second garden needs a gate.
The compost pile needs moved.
The rhubarb and horseradish need moved.
Dirt work over the new water line.
Dirt work on the hill next to the house.
Transplant raspberries.
Build a patio cover and 2 decks.
Finish interior walls and drywall work.
Install cabinets, back-splash and center workstation island in Kitchen.
Finish bathroom.
Install flooring.

I think I need to clone myself! Two of us just isn’t enough to get all of this work done. Thank Yah for our looooong summer days!